Improvement costs TBA
Improvement costs per measure TBA
All numbers from Material are Euro values, excluded of VAT. Download PDF for all possible default values to overwrite for the measures.
Note: all costs for insulation and glass are per square meter(m2).
Code
Description
Material
Work
Saving Material
Saving Work
10001
Wall insulation to type ''Matig/na-insulation''
22
14
20
13
Default improvement costs code per measure from 1st January 2024
"improvement_costs": [
{
"code": 10001,
"material": 14,
"work": 9,
"saving_material": 13,
"saving_work": 8
},
{
"code": 10002,
"material": 46,
"work": 70,
"saving_material": 42,
"saving_work": 65
},
{
"code": 10003,
"material": 91,
"work": 65,
"saving_material": 85,
"saving_work": 60
},
{
"code": 20002,
"material": 10,
"work": 16,
"saving_material": 9,
"saving_work": 15
},
{
"code": 20003,
"material": 22,
"work": 27,
"saving_material": 20,
"saving_work": 25
},
{
"code": 30002,
"material": 84,
"work": 148,
"saving_material": 77,
"saving_work": 137
},
{
"code": 30003,
"material": 119,
"work": 168,
"saving_material": 111,
"saving_work": 155
},
{
"code": 40002,
"material": 25,
"work": 64,
"saving_material": 23,
"saving_work": 60
},
{
"code": 40003,
"material": 52,
"work": 70,
"saving_material": 48,
"saving_work": 66
},
{
"code": 50001,
"material": 57,
"work": 128,
"saving_material": 53,
"saving_work": 119
},
{
"code": 50002,
"material": 53,
"work": 110,
"saving_material": 50,
"saving_work": 100
},
{
"code": 50003,
"material": 134,
"work": 34,
"saving_material": 124,
"saving_work": 32
},
{
"code": 50102,
"material": 135,
"work": 320,
"saving_material": 124,
"saving_work": 295
},
{
"code": 50103,
"material": 361,
"work": 94,
"saving_material": 334,
"saving_work": 86
},
{
"code": 50203,
"material": 361,
"work": 94,
"saving_material": 334,
"saving_work": 86
},
{
"code": 60001,
"material": 1639,
"work": 1661,
"saving_material": 1518,
"saving_work": 1538
},
{
"code": 60002,
"material": 2880,
"work": 2681,
"saving_material": 2667,
"saving_work": 2482
},
{
"code": 60003,
"material": 3647,
"work": 1689,
"saving_material": 3378,
"saving_work": 1564
},
{
"code": 60004,
"material": 4155,
"work": 2339,
"saving_material": 3848,
"saving_work": 2165
},
{
"code": 80004,
"material": 6782,
"work": 6755,
"saving_material": 6281,
"saving_work": 6254
},
{
"code": 80104,
"material": 2668,
"work": 2354,
"saving_material": 2470,
"saving_work": 2180
},
{
"code": 80204,
"material": 2203,
"work": 1363,
"saving_material": 2040,
"saving_work": 1262
},
{
"code": 80305,
"material": 4739,
"work": 2076,
"saving_material": 4388,
"saving_work": 1923
},
{
"code": 80406,
"material": 2837,
"work": 1243,
"saving_material": 2627,
"saving_work": 1152
},
{
"code": 80506,
"material": 2837,
"work": 1243,
"saving_material": 2627,
"saving_work": 1152
},
{
"code": 80006,
"material": 10276,
"work": 8841,
"saving_material": 9516,
"saving_work": 8186
},
{
"code": 80106,
"material": 5651,
"work": 3738,
"saving_material": 5232,
"saving_work": 3461
},
{
"code": 80306,
"material": 4486,
"work": 2329,
"saving_material": 4154,
"saving_work": 2157
},
{
"code": 80007,
"material": 25410,
"work": 8416,
"saving_material": 23527,
"saving_work": 7793
},
{
"code": 80107,
"material": 18839,
"work": 6087,
"saving_material": 17445,
"saving_work": 5635
},
{
"code": 80407,
"material": 18543,
"work": 5991,
"saving_material": 17170,
"saving_work": 5547
},
{
"code": 80008,
"material": 9618,
"work": 4640,
"saving_material": 8906,
"saving_work": 4297
},
{
"code": 80108,
"material": 10352,
"work": 5199,
"saving_material": 9585,
"saving_work": 4814
},
{
"code": 80408,
"material": 10979,
"work": 5514,
"saving_material": 10165,
"saving_work": 5105
},
{
"code": 80009,
"material": 13983,
"work": 6731,
"saving_material": 12948,
"saving_work": 6233
},
{
"code": 80109,
"material": 10400,
"work": 2476,
"saving_material": 9629,
"saving_work": 2292
},
{
"code": 80209,
"material": 9278,
"work": 1608,
"saving_material": 8590,
"saving_work": 1489
},
{
"code": 80029,
"material": 18845,
"work": 7515,
"saving_material": 17449,
"saving_work": 6958
},
{
"code": 80129,
"material": 19029,
"work": 6627,
"saving_material": 17619,
"saving_work": 6136
},
{
"code": 80529,
"material": 19541,
"work": 6115,
"saving_material": 18093,
"saving_work": 5662
},
{
"code": 80030,
"material": 10595,
"work": 6888,
"saving_material": 9810,
"saving_work": 6378
},
{
"code": 80130,
"material": 7901,
"work": 2295,
"saving_material": 7317,
"saving_work": 2124
},
{
"code": 80430,
"material": 5940,
"work": 2376,
"saving_material": 5500,
"saving_work": 2200
},
{
"code": 80031,
"material": 11288,
"work": 5205,
"saving_material": 10452,
"saving_work": 4820
},
{
"code": 80131,
"material": 11810,
"work": 4683,
"saving_material": 10935,
"saving_work": 4337
},
{
"code": 80431,
"material": 11810,
"work": 4683,
"saving_material": 10935,
"saving_work": 4337
},
{
"code": 80010,
"material": 2949,
"work": 916,
"saving_material": 2730,
"saving_work": 848
},
{
"code": 70000,
"material": 140,
"work": 164,
"saving_material": 128,
"saving_work": 153
},
{
"code": 94001,
"material": 547,
"work": 111,
"saving_material": 506,
"saving_work": 103
}
]Column descriptions
Input
Format
Description
Translation
material
integer
Total investment cost per unit for material (excluding VAT).
Kosten totale investering per eenheid voor materiaal (exclusief BTW).
work
integer
Total investment cost per unit for the labor (excluding VAT)
Kosten besparingsdeel van de investering per eenheid voor arbeid (exclusief BTW).
saving_material
integer
Cost-saving part of the investment per unit for material (excluding VAT).
Kosten besparingsdeel van de investering per eenheid voor materiaal (exclusief BTW).
saving_work
integer
Cost-saving part of the investment per unit for the labor (excluding VAT).
Kosten besparingsdeel van de investering per eenheid voor de arbeid (exclusief BTW).
Input schema
Input example
Saving work and -material numbers explained
The saving_material and saving_work variables per part concern the saving part of the investment, split into material and labour. This affects the final calculation of CO2 emissions and the ELG.
saving_material: cost saving part of the investment per unit for material (excluding VAT). saving_work: cost saving part of the investment per unit for labor (excluding VAT).
As a rule, the savings share is on average 92.5% (between 90 and 94%) of the investment in material and labour.
Laatst bijgewerkt